Quality Control on ERW Risk Reduction Project for Construction of “New Sava Bridge – Underwater Area” 2. August 2024.
Controlled Demolition of a Depth Charge on the Bank of the Danube River (The renowned German “Wasserbombe”) 1. June 2026.