Quality Control on Projectfor ERW Clearance on Gas Pipeline Route on Section Leskovac – Vranje
On March 21, 2024, representatives of SMAC performed quality control according to Phase II and III of the ERW clearance project on the gas pipeline route on the section Leskovac – Vranje.
The performed quality control did not identify any critical errors determined by this Project.
The contractor continues to carry out the works in coordination with the SMAC.
The project was developed by SMAC in order to eliminate the danger ERW pose for the construction of the gas pipeline on the section Leskovac – Vranje.
The area to be cleared is located in the territories of the following municipalities: Vranje, Vranjska banja, Vladičin Han, Leskovac.
ERW clearance is also carried out on the areas intended for the construction of gas pipeline facilities (substation and overhead facilities).