Quality Control on Sava Bridge – Land Part Project

On 2 September 2024, the SMAC carried out the quality control of the works performed in the second and third phases of the ERW Clearance Project at the New Sava bridge – land part site and the changes and additions to the Project, which includes finding ERW up to a 3 meter depth.

The quality control that was carried out did not identify any critical errors determined by this Project.

The area to be cleared from ERW is located in the territory of the City of Belgrade, between the Old Sava and Branko’s bridges.

ERWs pose a serious danger to people and property, and safe and successful reconstruction and development of urban areas will be enabled by clearing the site.

You may also like...